Cyprus House

Status: Construction due to start in 2023 Location: Paphos, Cyprus A holiday home for a large Cypriot family on the outskirts of Paphos facilitates indoor-outdoor luxury living and entertaining. The indoor/outdoor connection is created with full height doors and a...

read more

Fulham House

Status: Completed 2021 Location: Parsons Green, Fulham Construction Budget and Programme: £300k, 10 months This large property in Parsons Green was previously a doctors surgery before historically being converted to a chemist and two flats. Our proposal refurbished...

read more

Harrow Semi-Detached House

Status: Completed 2017 Location: Harrow Construction Cost and Build-Time: £120k, 5 months. The design for this new extension in North London creates a wow factor living, kitchen, dining space that is the full width of the site. Full height doors maximise light coming...

read more

Lambeth Semi-Detached House Transformation

Status: Completed 2022 - Photography scheduled for Autumn 2022 Location: Herne Hill, Lambeth Construction Budget and Build-Time: £500k, 12 months. The original semi-detached house was in very poor condition with structural issues when purchased by our client with a...

read more

Waltham Forest Apartment

Status: Completed 2020 Location: Leyton, Waltham Forest Construction Budget and Programme: £120k, 4 months. The existing property was a Victorian Abrahams first floor flat with 2 bedrooms. The proposal includes a loft extension with two bedrooms and a shower room, a...

read more

Wimbledon Terraced House

Status: Completed 2016 Location: Wimbledon Construction Cost and Build-Time: £150k, 5 months. This probate mid-terrace Victorian house required gutting, extending and a full refurbishment to become this family's forever home. ​We assisted with this budget sensitive...

read more

Newham End-Of-Terrace House and Garden

Status: Completed 2020 Location: Stratford, Newham Construction Cost, Build-Time: £150k, 6 months The original house was a mid-terraced three bedroom house where the living spaces were subdivided and any views to the large garden were blocked by an outdoor WC and rear...

read more

Camden Townhouse

Status: Completed 2019 Location: Camden Construction Cost and Build-Time: £400k, 12 months A growing family's home in Camden transformed and reconfigured from a traditional 2 bedroom property to a light-filled forever-home with 5 bedrooms, three bathrooms, large open...

read more

Hampstead Townhouse Apartment

Status: Completed 2021 Location: Hampstead, Camden Construction Budget and Programme: £400k, 10 months. The proposal extends an existing three bedroom flat at basement and ground floor level at the bottom of this Hampstead townhouse.​ Working closely with the...

read more